The project is located in the north Bund of the central city, which is an important part of the Hongkou Port water system regulation project. The pump gate is located at the south end of the Hongkou Port water system and the river enters the mouth of the Huangpu River。It is one of the 10 waterlogging pump sluice projects in the central city of Shanghai Water planning completed during the "eleventh Five-Year Plan" period, which was extended to the early completion of the "Twelfth Five-Year Plan" due to land expropriation and demolition and other reasons。As the pump gate of Hongkou Port has not been implemented, the flood control and drainage functions of the whole Hongkou Port water system have not reached the planning and design standards。Therefore, speeding up the implementation of the Hongkou port pump gate project is a practical project and popular project of Hongkou District government and even Shanghai。The design drainage flow of Hongkou Port pump gate is 30m3/s, the reverse diversion flow is 10m3/s, and the net width of single-hole sluice gate is 8m。 |